Paramount Condominium
- Project Name: 700 N Fort Lauderdale Beach Blvd, Fort Lauderdale, FL 33304
- Contractor: Stiles Construction
- Architect: Revuelta Architecture
- General Contractor: Mark 1 Restoration Company
- Products Specified:
- Cetco’s Ultraseal SP & BT for the 10 year Hydroshield Warranty to the building foundation and backfilled walls
- Tremco’s 350/351 pedestrian traffic coating system to all balconies and eyebrows
- Tremco’s 350/951/951 vehicular Traffic coating system to the Level Two parking deck and the Level One loading dock
- Tremco’s MSUP Primer/120 mils of Tremco’s 250GC and TremDrain 1000 to the amenities deck, pool interstitial and planters horizontal slabs
- Tremco’s RootGuard and 90 mils of Tremco’s 250 GC to all planter walls
- V-Seal 101 clear sealer to the basement Slab
- Scope of Work:
- Waterproofing
- Traffic Coating
- Clear Sealer
At the Paramount Condominium, GCC signed to completely envelop the entire below grade foundation of the structure including pile caps, slab on grade, footings, and retaining walls with Cetco’s Ultraseal, providing our valued client with a 10 year Hydrosheild warranty. After the tower was up, GCC waterproofed all planters as well as the amenities deck before and after topping slabs with Tremco’s TremProof 250 GC with drainage mat. Prior to installation of windows and stucco in the tower our installers applied a detail strip of Tremco’s Vulkem 350 under the window slider and 8’’ up the exterior balcony walls, and later tied on to it to completely coat all the balcony slabs and eyebrows with Tremco’s Vulkem 350/351 pedestrian traffic coating system.
We also provided our client with Tremco’s Vulkem 350/951/951 heavy duty vehicular traffic coating system to the Level Two parking deck and the Level One loading dock.
GCC also installed the new Tremco EWS under tile system to the level one driveway prior to installing pavers. At the basement level, our applicators pressure washed the slab and applied V-Seal 101 clear penetrating sealer prior to installing robots for the state of the art automated parking system.
With the extensive amount of work being performed on this project, GCC‘s management team coordinated with the Stiles team daily to overcome job site obstacles to assure them that our work was being performed with quality in a timely manner.
Project Details
Skills Needed:
- Bentonite
- Fluid Applied Membranes
- Pressure Cleaning
- Sheet Applied Membranes
- Vehicular Coatings